VILLAGE OF TELKWA 2022 SANITARY SEWER MANHOLE REPAIRS

The Village of Telkwa is planning to repair six (6) to thirty (30) of its pre-cast concrete sanitary sewer manholes during the 2022 construction season. The need for manhole repair is to eliminate the inflow and infiltration occurring at each of these manholes. The purpose of this Notice of Project Intent is to invite prospective Contractors to join the Village of Telkwa and TRUE Consulting to observe the suspected manholes needing repair during high inflow and infiltration periods which typically occur between March 15th and May 15th each year.


Inflow and Infiltration is heavily reliant on the weather; therefore, a date for the proposed manhole observations cannot be set at this time. Flow through the sanitary sewer system will be monitored and when daily flows begin to consistently increase an amendment will be posted to BC Bid indicating a date and time for proposed manhole observations. The posting will provide a minimum of five (5) working days notice prior to the date. All prospective Contractors who return the Project Registration Form will be notified by email once the date is set.


Prospective Contractors can anticipate the manhole observations to take place between March 15, 2022 and May 15, 2022. The Village and TRUE Consulting will be observing the previously identified inflow and infiltration problem manholes starting at 8:00 am and ending at 12:00 pm. Prospective Contractors are welcome to join the Village and TRUE Consulting for a little or as long as they like. Additional information regarding when and where to meet will be provided once the 2022 inflow and infiltration flows begin.



Notice of Project Intent-Telkwa-2022 Manhole Repair-Feburary 2022
.pdf
Download PDF • 230KB

Recent Posts

See All