• Village of Telkwa

RFP issued for Coalmine Road Watermain Replacement (Southwest)

The Village of Telkwa has issued a Request for Proposals for the Engineering Design, Tendering, and Construction Management of Coalmine Road Watermain Replacement (Southwest)

RFP #5330-21

The Village of Telkwa is requesting submission of Proposals from qualified Consultants for design, tendering, and construction services in accordance with the Master Municipal Construction Documents Association’s latest publication.


The subject of this Proposal will be the upgrading and replacement of a watermain along a portion of Coalmine Road (see Appendix B for a map of the region) The approximate length of total pipe replacement is 570 lineal meters.


Request Issued: January 7, 2022

Closing Date: February 14, 2022, at 2:00 p.m.


All contract documents are available through the BC Bid website. The Proponent is solely responsible for ensuring any addenda are downloaded, reviewed and included in their bid.


Proposals will be accepted up to February 14, 2022 @ 2:00 PM . Proposals must be sealed in an opaque envelope, clearly marked with the name and the project name/number, and will be received by Lev Hartfeil, Director of Operations at: Box 220, Telkwa, BC V0J 2X0 or 1415 Hankin Avenue, Telkwa, BC. Proposals will also be accepted by email, if received by the deadline at directorofoperations@telkwa.ca and admin@telkwa.ca


Coalmine_Watermain_Replacement_SW
.pdf
Download PDF • 517KB

16 views